GEPCO Online Application for New Connection in 2024

GEPCO online application for the new connection in 2024

As the population grows, the demand for new electricity connections in Pakistan is increasing, and the focus is on constructing new homes. If you want to apply for a new electricity connection from GEPCO, this website guides you free of charge through the online application process and the necessary steps.

About GEPCO Connections

In Pakistan, there are two types of connections available:
1.      Single-phase: For households with lower energy needs (up to 15 kW).
2.      Three-phase: For homes with higher energy consumption (above 15 kW).
Before applying, understand your power requirements to choose the right connection type for your home.

Application Methods

You have two options to apply for a new GEPCO connection:

  1. Manual Application: Visit the nearest GEPCO office and fill out a paper form.
  2. Online Application: Use the GEPCO online portal, which is very easy and time-saving.

If you prefer the traditional route:
1. Visit the GEPCO Office: Go to your nearest sub-divisional office.
2. Fill Out the Form: Provide your name, address, phone number, and other required details.
3. Prepare Your Documents:
1. A copy of your CNIC (identity card).
2. Property ownership documents or an owner’s permit if you are renting.
4. Submit Your Application: Hand in your completed form and documents. You will receive a receipt for your submission.

Using the online portal is very simple. These are methods for GEPCO Online Application for New Connection in 2024.

  1. Neighbour’s GEPCO bill copy.
  2. Property ownership document
  3. Attested copy of your CNIC
  4. Attested copy of a witness’s CNIC.
  5. Wiring test report from a certified contractor.

Visit the ENC official website.

1. Click on the “Apply” section

2. Select the type of connection you need

Enter your details, including:

  1. Connection type
  2. Applicant and contact information
  3. Property details.

Understand your information, check the “I Agree” box, and click the “Submit” button.

Checking Your Application Status

After submitting the application form, you can easily track your application:

  1. Visit the ENC Portal: Click on the “Track” section.
  2. Select Application Type: Choose “New Connection.”
  3. Enter Your Details: Input your CNIC or tracking ID provided during your application.
  4. Submit: Click the “Submit” button to view your application status.

Demand Notice

Once your application is approved, GEPCO will issue a demand notice outlining the installation fee, which typically ranges from PKR 9,000 to PKR 12,000. This fee covers the metre installation and a 40-metre wire. If the length of the wire is greater than 40 metres, additional charges may apply if your property is further from the electric pole.

Conclusion

To follow this guide, you should be well-equipped to apply for the GEPCO Online Application for New Connection in 2024 with ease. Whether you choose to apply online or manually, make sure you have all the necessary documents ready.